HOT LINKS:  
About Us News Center Product Introduction Contact Us Chinese
     
 
Company Brief
Geographical Location

 

 
╠ INDEX--ABOUT US   
  

 

On December 20, 2013

the steel-cutting ceremony of the first two vessels of Tomini’s 64000DWT bulk carriers was held at the preparation workshop of China Shipping Industry (Jiangsu) Co., Ltd, taking the first step toward the world.

On November 29, 2013

Mr. Wang Yiling, the Executive Director of China Shipping Industry (Jiangsu) Co., Ltd and Mr. Su Wenjinthe President of Jimei University entered into a construction contract of a teaching practice ship for navigation major.

On August 27, 2013

the secretary of municipal party committee of Yangzhou city, Xie Zhengyi paid a visit to China Shipping Industry (Jiangsu) Co., Ltd. and investigated how the city’s major projects promote.

In the morning of
 August 6,  2013

the steel cutting ceremony of the No.4 10,000TEU container ship was smoothly carried out in the preparation workshop of China Shipping Industry (Jiangsu) Co., Ltd.

On April 28, 2013

China Shipping Industry (Jiangsu) Co., Ltd. began to build the 10,000TEU container ships of China Shipping Container Lines Co., Ltd.

On April 21, 2013

2013 China Shipping Cup of Yangzhou Jianzhen International Halfway Half Marathon Competition and 2013 National Halfway Half Marathon Competition commenced in Yangzhou city.

On March 28, 2013

China Shipping Industry Co., Ltd. and Hudong Zhonghua Shipbuilding (Group) Co., Ltd began to cooperate in building 10,000TEU container ships.

December 24, 2012

On Dec.24th,2012, CICJS passed the CMS measurement and management system certification.

December 12, 2012

On Dec.12, 2012, the world's largest and most advanced 48000 tonner ocean practice teaching ship "Yu Ming" built for Shanghai Maritime University was successfully named and delivered.

November 07, 2012

On Nov.7, 2012, CICJS passed the Jiangsu provincial safety   production standardization level two enterprise appraisal,     and became the first repairing and shipbuilding enterprise that got this qualification in Jiangsu.

November 03, 2012

On Nov.3, 2012, the “cleaner production” work of CICJS passed the inspection and acceptance which was carried out by Provincial Environmental Protection Bureau, Environmental Protection Bureau organization of Yangzhou City and Jiangdu District.

May 26, 2012

At 10:36 a.m. on May 26, 2012the 110,000 tonner Aframax product tanker built for China Shipping Development Co., Ltd. Tanker Company was steel-cut. It is a new ship type built by our company and it symbolizes that China Shipping Industry (Jiangsu) Co., Ltd. has made a breakthrough in the building of modern and large-sized ships during the Twelfth Five-Year Plan period.

May 25, 2012

At 9:06 a.m. on May 25, 2012the world's biggest and most advanced 48,000MT oceangoing teaching practice ship built for Shanghai Maritime University was launched by the 80,000 tonner slipway smoothly.

July 2011

CICJS won the Level 1 Class I national steel made general vessel production enterprise certificate.

November 11, 2010

The annual production capacity of CICJS broke through 1 million DWT which created the new domestic record of completing 1 million DWT production capacity during the shipyard construction period.

June 12, 2010

On June 12, 2010, the “three in one ”management system of CICJS passed the management system certification of CCS quality certification company.

September 20, 2009

CICJS carried out “six vessels simultaneously in building” and “six vessels floating while three vessels launching” in No.2 dry dock successfully, which made domestic and international history of simultaneously building of large vessels.

June 25, 2009

The secretary of Party Committee of Jiangsu Province Liang Bao hua inspected the construction of the shipbuilding base in rain, heard the report thereof from the general manager of China Shipping Industry Wu Chengye, with hopes of making more trails and efforts to develop the series ship products with high-tech content and high affixture.

June 30, 2008

The first vessel in CICJS of 46000DWT product oil tanker “QIAN CHI” was successfully named and delivered.

March 01, 2008

CICJS started the construction of “four major projects. NO.3 Dry Dock,900 tonner Gantry Crane, Sand blowing project , Facilities of Living Area

November 28, 2007

CICJS successfully signed 10 billion RMB shipbuilding contracts.

September 16, 2007

CICJS started the construction of the “three major projects”.NO.2 Dry Dock, 900 tonner Gantry Crane, NO.3 Outfitting Quay.

May 17, 2007

China Shipping Industry (jiangsu) Co., LTD. (CICJS) was registered.

April 28,2007

China Shipping Jiangsu shipbuilding base laid the foundation

   
  Add: No.1,Yingzhou RD,Jiangdu City,Jiangsu Province,China; P.C.:225211; Tel:0514-86542828; Mail:js@csgcic.com

免责声明: 本站资料及图片来源互联网文章,本网不承担任何由内容信息所引起的争议和法律责任。所有作品版权归原创作者所有,与本站立场无关,如用户分享不慎侵犯了您的权益,请联系我们告知,我们将做删除处理!